Capital Project Tracking and Reporting SystemCity of St. Joseph, Missouri
CSO Green Demonstration Projects
 

Project Information

CSO Green Demonstration Projects
420-910

Project Manager: Bob Todd

Assistant Project Manager: David Frazier

Current Project Status: Bidding and Award

Project Scope:
   To design a CSO Green solutions Demonstration Project. The Green Solutions Demonstration Project when complete will consist of a basin located south of NE Parkway and east of NW parkway. The basin will capture and detain storm water until the downstream combined sewer overflow has subsided. At which point it will release the water which will then flow to the treatment plant instead of bypassing to the Missouri River.  

Project Funding:
   2007 Sewer Bonds
   2015 A IDA Bonds
   CIP Sales Tax
   MISC
   SEWER FUND
   SEWER FUND BAL

Project Funding Amount: $429,666.77

Update:
   Wetland Control Wiring: This project consists of installing conduit and wiring to connect the existing control panel to the overflow structure. Advertisement for bids was on September 25th and the bid opening took place on October 11th. 

Last Update: Wednesday November 1, 2017